CTRMA 183A
Project Description
This 6.6-mile roadway will extend 183A north from Hero Way to north of SH 29 and have two tolled lanes in each direction with an option to widen to three lanes in the future. The Mobility Authority’s highway will be located within the existing TxDOT right-of-way and within the median of the existing US 183 corridor. ALC Scopes include Erosion Control and Landscaping. Construction is currently underway.
Timeline
September 2024 to Current
Budget
$3,405,765